Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), 1011-20.

Cheng, E W L and Li, H (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22(10), 1021-32.

  • Type: Journal Article
  • Keywords: Analytic network process; analytic hierarchy process; multi-criteria decision making; contractor selection
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/0144619042000202852
  • Abstract:

    Contractor selection is one of the main activities of clients. Without a proper and accurate method for selecting the most appropriate contractor, the performance of the project will be affected. The multi-criteria decision-making (MCDM) is suggested to be a viable method for contractor selection. The analytic hierarchy process (AHP) has been used as a tool for MCDM. However, AHP can only be employed in hierarchical decision models. For complicated decision problems, the analytic network process (ANP) is highly recommended since ANP allows interdependent influences specified in the model. An example is demonstrated to illustrate how this method is conducted, including the formation of supermatrix and the limit matrix.

Clarke, L and Herrmann, G (2004) Cost vs. production: labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), 1057-66.

Lam, P T I, Kumaraswamy, M M and Ng, S (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), 1067-79.

Lingard, H and Saunders, A (2004) Occupational rehabilitation in the construction industry of Victoria. Construction Management and Economics, 22(10), 1091-101.

Phua, F T T (2004) The antecedents of co-operative behaviour among project team members: an alternative perspective on an old issue. Construction Management and Economics, 22(10), 1033-45.

Shohet, I M and Paciuk, M (2004) Service life prediction of exterior cladding components under standard conditions. Construction Management and Economics, 22(10), 1081-90.

Wang, R-C and Liang, T-F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), 1047-56.